{"id":941,"date":"2013-10-17T07:18:00","date_gmt":"2013-10-17T07:18:00","guid":{"rendered":"http:\/\/hamilton.global\/index.php\/2013\/10\/17\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/"},"modified":"2013-10-17T07:18:00","modified_gmt":"2013-10-17T07:18:00","slug":"la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo","status":"publish","type":"post","link":"https:\/\/hamilton.global\/en\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/","title":{"rendered":"The importance of quality field work for optimal analysis"},"content":{"rendered":"<div style=\"text-align: justify;\">\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">In quantitative market studies, the quality of the data obtained from the sample is unquestionable. These data will be the basis of the study since from them, in subsequent phases of the field, they will be compiled, tabulated, analyzed and presented to the client, so any measure to increase its quality is positive. Clients invest a large amount of resources to obtain reliable and significant data about their market from which decisions, sometimes vital for the company, will be made. The basis of this entire process is field work.<o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">In this post we will talk about the phases of field work and the rigor necessary in each of them to obtain quality data through personal interviews for quantitative market studies.<o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">Based on the objectives of the study, a structured questionnaire is configured that must be easy to interpret for the interviewer and with sufficiently clear questions for the interviewee. Sometimes marketing and research professionals err on the side of using our own jargon in any context that not everyone understands. It is necessary that the interviewee feel comfortable with the language used; This will make you feel safe, relaxed and we will achieve greater empathy and sincerity in the responses.<o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">Once all the general and specific objectives of the e<\/span><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">study through the questionnaire, it is tested. We call this phase piloting where two important points will be measured: the duration of the interview (basic to meet the budgets proposed between the parties) and any anomaly that may arise regarding its instructions (quotas, filters, nature of the questions, etc.).<\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">Most field companies, when conducting personal interviews, program the questionnaire on tablets, notebooks or laptops to facilitate recording the responses to the database. This practice reduces the time needed for the field but requires another control phase: the piloting of the programmed questionnaire. It is necessary to test all the variants of interviewees that we can find to validate all the filters and the correct display in questions of the Conjoint Analysis type, Choice Optimization Board or any question that requires video or audio type support. <o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">The launch of the field requires maximum communication between the parties, especially in its first days. A detailed briefing will sometimes not be enough but will require a face-to-face meeting to be sure that all the points (recruitment, quotas, filters, necessary material, protocol, space where the interviews are held, incentives, timings, key issues for the client) and all the points that are necessary) are clear.<o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">The learning curve for interviewers will go <i>in crescendo<\/i> as time passes and more interviews are conducted. It is normal for the first interviews to last a little longer than expected. Once the interviewees are familiar with the questions, the work flows and the process speeds up.<o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">Once the machine is well oiled, in operation and begins to produce outputs in the form of responses, the monitoring and validation phase begins. Supervision is carried out in different ways depending on the type of interview. The most common are the presence of the technician at the physical location of the interviews to be able to correct irregularities in real time and telephone supervision after recording the answers in the database. These two practices are not substitutes, but complementary. Hamilton supervises by telephone a 30% of the interviews of the sample of each quantitative study, in addition to being present the first days at the physical place where the interviews are carried out.<o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">There are several reasons why an interview is cancelled: due to the lack of proactivity of the interviewee if we have the opportunity to identify him in real time, due to the observation of inconsistent responses or responses without logical sense.<o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">Once the file is received, other quality controls are carried out based on statistical analyzes whose results could not have been identified in all the previous control phases. In any case, the field work will end when the technician has the necessary case base to meet quotas and perform the analyses.<o:p><\/o:p><\/span><\/div>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\"><br \/><\/span><\/div>\n<p><\/p>\n<div><span style=\"font-family: Arial, sans-serif; line-height: 115%;\">Obviously each type of study and methodology requires some important key points to take into account, on this occasion we have talked about personal interviews for quantitative studies, however several of these points can be perfectly applied to other methodologies and types of market studies.<o:p><\/o:p><\/span><\/div>\n<\/div>\n<div style=\"text-align: justify;\"><span style=\"line-height: 115%;\"><span style=\"font-family: Arial, Helvetica, sans-serif;\"><br \/><\/span><\/span><span style=\"line-height: 115%;\"><span style=\"font-family: Arial, Helvetica, sans-serif;\"><br \/><\/span><\/span><\/div>\n<div style=\"text-align: justify;\"><\/div>\n<div style=\"text-align: justify;\"><span style=\"line-height: 115%;\"><span style=\"font-family: Arial, Helvetica, sans-serif;\">Alfons Rotger<\/span><\/span><\/div>\n<span class=\"et_bloom_bottom_trigger\"><\/span>","protected":false},"excerpt":{"rendered":"<p>In quantitative market research, the quality of the data obtained from the sample is unquestionable. This data will form the basis of the study, as it will be compiled, tabulated, analyzed, and presented to the client in subsequent field phases. Therefore, any measure to improve its quality is beneficial. [\u2026]<\/p>","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"categories":[1],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>La importancia de un trabajo de campo de calidad para un an\u00e1lisis \u00f3ptimo -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hamilton.global\/en\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"La importancia de un trabajo de campo de calidad para un an\u00e1lisis \u00f3ptimo -\" \/>\n<meta property=\"og:description\" content=\"En los estudios cuantitativos de mercado, la calidad de los datos obtenidos de la muestra es incuestionable. Estos datos ser\u00e1n la base del estudio ya que a partir de ellos, en fases posteriores al campo, se consistir\u00e1n, tabular\u00e1n, analizar\u00e1n y presentar\u00e1n al cliente, por lo que cualquier medida para incrementar su calidad es positiva. Los [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hamilton.global\/en\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/\" \/>\n<meta property=\"og:site_name\" content=\"Hamilton\" \/>\n<meta property=\"article:published_time\" content=\"2013-10-17T07:18:00+00:00\" \/>\n<meta name=\"author\" content=\"Jorge Teixeira\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jorge Teixeira\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/\",\"url\":\"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/\",\"name\":\"La importancia de un trabajo de campo de calidad para un an\u00e1lisis \u00f3ptimo -\",\"isPartOf\":{\"@id\":\"https:\/\/hamilton.global\/#website\"},\"datePublished\":\"2013-10-17T07:18:00+00:00\",\"dateModified\":\"2013-10-17T07:18:00+00:00\",\"author\":{\"@id\":\"https:\/\/hamilton.global\/#\/schema\/person\/69321faffe1268f4146b04146cef3a28\"},\"breadcrumb\":{\"@id\":\"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/hamilton.global\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"La importancia de un trabajo de campo de calidad para un an\u00e1lisis \u00f3ptimo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/hamilton.global\/#website\",\"url\":\"https:\/\/hamilton.global\/\",\"name\":\"Hamilton Global\",\"description\":\"Market Intelligence Consulting Company\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/hamilton.global\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/hamilton.global\/#\/schema\/person\/69321faffe1268f4146b04146cef3a28\",\"name\":\"Jorge Teixeira\",\"url\":\"https:\/\/hamilton.global\/en\/author\/jorge\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"La importancia de un trabajo de campo de calidad para un an\u00e1lisis \u00f3ptimo -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hamilton.global\/en\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/","og_locale":"en_GB","og_type":"article","og_title":"La importancia de un trabajo de campo de calidad para un an\u00e1lisis \u00f3ptimo -","og_description":"En los estudios cuantitativos de mercado, la calidad de los datos obtenidos de la muestra es incuestionable. Estos datos ser\u00e1n la base del estudio ya que a partir de ellos, en fases posteriores al campo, se consistir\u00e1n, tabular\u00e1n, analizar\u00e1n y presentar\u00e1n al cliente, por lo que cualquier medida para incrementar su calidad es positiva. Los [&hellip;]","og_url":"https:\/\/hamilton.global\/en\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/","og_site_name":"Hamilton","article_published_time":"2013-10-17T07:18:00+00:00","author":"Jorge Teixeira","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jorge Teixeira","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/","url":"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/","name":"La importancia de un trabajo de campo de calidad para un an\u00e1lisis \u00f3ptimo -","isPartOf":{"@id":"https:\/\/hamilton.global\/#website"},"datePublished":"2013-10-17T07:18:00+00:00","dateModified":"2013-10-17T07:18:00+00:00","author":{"@id":"https:\/\/hamilton.global\/#\/schema\/person\/69321faffe1268f4146b04146cef3a28"},"breadcrumb":{"@id":"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/hamilton.global\/es\/la-importancia-de-un-trabajo-de-campo-de-calidad-para-un-analisis-optimo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hamilton.global\/"},{"@type":"ListItem","position":2,"name":"La importancia de un trabajo de campo de calidad para un an\u00e1lisis \u00f3ptimo"}]},{"@type":"WebSite","@id":"https:\/\/hamilton.global\/#website","url":"https:\/\/hamilton.global\/","name":"Hamilton Global","description":"Market Intelligence Consulting Company","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hamilton.global\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/hamilton.global\/#\/schema\/person\/69321faffe1268f4146b04146cef3a28","name":"Jorge Teixeira","url":"https:\/\/hamilton.global\/en\/author\/jorge\/"}]}},"_links":{"self":[{"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/posts\/941"}],"collection":[{"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/comments?post=941"}],"version-history":[{"count":0,"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/posts\/941\/revisions"}],"wp:attachment":[{"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/media?parent=941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/categories?post=941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hamilton.global\/en\/wp-json\/wp\/v2\/tags?post=941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}